|
BUOYANCY
INDUCED DISPERSION (BID) COMPONENT OF
AND y z
For
the CBL’s Direct & Indirect sources, Buoyancy Induced
Dispersion (BID) is calculated following Weil

The
direct source plume rise is calculated from eq. (116).
For
the Penetrated Source, BID is calculated as follows:

The
height of the penetrated source (hep)
is calculated from eq. (119)
in section 3.e.1).
For
the Stable Source BID is calculated as follows:

The
stable plume rise (
hs ) is calculated from eq. (120).
6
The AMS/EPA Regulatory Model AERMOD
6.1
General Structure of AERMOD Including Terrain
6.2
AERMOD Concentration Predictions in the CBL
6.2.1
DIRECT SOURCE CONTRIBUTION TO CONCENTRATION
CALCULATIONS
IN THE CBL
6.2.2
INDIRECT SOURCE CONTRIBUTION TO CONCENTRATION
CALCULATIONS
IN THE CBL
6.2.3
PENETRATED SOURCE CONTRIBUTION TO CONCENTRATION
CALCULATIONS
IN THE CBL
6.3
Concentrations in the SBL Calculated by AERMOD
6.4
Estimation of Dispersion Coefficients
6.4.1
AMBIENT TURBULENCE FOR USE IN CALCULATING DISPERSION
6.4.2
BUOYANCY INDUCED DISPERSION (BID) COMPONENT OF _ AND _
y z
6.4.3
COMPONENT OF DISPERSION COEFFICIENTS DUE TO
DOWNWASH
6.5
Plume Rise Calculations in AERMOD
6.5.1
PLUME RISE IN THE CBL
6.5.2
PLUME RISE IN THE SBL
6.6
Source Characterization
6.7
Adjustments for the Urban Boundary Layer
<
Back | Table of Contents |
Forward >
|